Fact Sheet on the New Transmission Line to Pickle Lake Project Corridor Routing Analysis

July 7, 2013

The purpose of the routing analysis factsheet is to explain the methods and results of the Corridor Routing Analysis completed by Wataynikaneyap to identify a preferred corridor for the New Transmission Line to Pickle Lake Project.

The fact sheet can be downloaded below.

Document:
application/pdf icon2013-07-03 1111510456 Corridor Routing Analysis Factsheet.pdf